Regulation (EU) 2025/40 grades packaging recyclability on a three-step scale set in Annex II. The scale stops at C: there is no fourth grade and no A to E ladder. This page covers the thresholds, the market-access ladder, and what "recyclable at scale" adds in 2035.

The Annex II scale

GradeRecyclable by weightWhat it means
A95 percent or moreTop grade. Expected to attract the largest eco-modulation discounts once grade-based modulation binds.
B80 percent or moreStill on the market after 2038, when Grade C is phased out.
C70 percent or moreThe minimum to be placed on the EU market from 2030, and off the market from 2038.
Below 70 percentunder 70 percentNon-recyclable under the regulation. Cannot be placed on the EU market from 2030.

Two dates that are often merged

Article 6(1) requires that all packaging placed on the market is recyclable, and carries no separate application date, so it applies from 12 August 2026. Until the Article 6(4) act applies, compliance is measured against the previous Directive requirements and the related harmonized standard EN 13430:2004, and the Article 38 conformity assessment is not yet run for recyclability.

Article 6(2)(a), the design-for-recycling criteria and the A, B, C grades themselves, applies from 1 January 2030 or 24 months after the Article 6(4) delegated act enters into force, whichever is the latest. That act is due by 1 January 2028, so if it slips the 2030 date slips with it.

The market-access ladder

Where the grade meets the fee

Grade-based eco-modulation of EPR fees rests on Article 6(4)(d) together with the Article 45(1) EPR obligation, and binds roughly 18 months after the design-for-recycling act, so about mid-2029. Article 46 governs producer responsibility organizations and does not govern eco-modulation. Harmonized EU-wide fee amounts are not set: member states keep their own rates, and national schemes already modulate by design today.

Technical criteria per material are pending the Article 6(4) delegated act. The operational method is being built on EN 18120:2026 (CEN/TC 261/SC 4/WG 10, mandate M/584), which is voluntary until the act makes a method binding and is not itself the legal grade.

Read Article 6 in detail  |  Open the Format Risk Screener